Madison Ridgeland Academy

Video –
Install 66 Cameras and Run Cable
Every room and hall ways, plus cafeteria and stairwell, MDF on every floor
Access Control-
Pull cable to all 7 ACP’s see drawing
Clocks and Speakers-
Speaker wire is CAT 5 (or CAT 6) I’ve attached speaker wire cable distance to the head in.
Clocks are daisy chained via the attached info on the first page of the Converter Box Calculator.
Picture of the Alectro and the punch block.
Mount and Run cable to 31 Speakers
To include all class rooms and locations of clocks on drawing
Mount 2 clocks and 7 Double clocks
Network Drops
Three drops per “regular” class room (two regular and WAP) (3)
ALL WAPS drop and they install hardware
The STEM Labs are 12 WS’s a projector and WAP (14)
The Computer Lab has 25 drops and Teacher and WAP (27)